Do's
  • All layers should be drawn either open or close polylines.
  • Text should be given to entity as required.
  • Text should be inside or overlapped with particular entity.
  • Draw particular entity on respective layer.
  • Balcony layer should be drawn outside of FSI Polyline.
  • Step by step PreDCR verification process should be followed through PreDCR toolbar.
  • Insert Common & Direction reference circle in each floor plan and PropWork at the same location.
  • For main road, road widening, ramp, Internal road, DP road entity, text should start with Numeric value. (e.g. – 9.00 m wide main road)
  • Intermediate and floor landing should be drawn inside staircase Polyline.
Don’ts
  • Do not draw balcony layer inside of FSI Polyline.
  • Do not draw FSI Polyline outside of building layer entity.
  • Do not draw intersecting FSI polylines.
  • Do not draw parking entity outside of floor and main plot poly.
  • Do not draw balcony on ground floor.
  • Do not draw FSI polyline in Parking/Stilt floor.
  • Do not draft any type of parking manually, it should only be inserted through PreDCR menubar.

  • Entity contain more than one text.
    It means Entity on this layer contain more than one text. So remove the extra text. PreDCR need only one text for one entity.
  • Entity not contain any text.
    It means this entity not having any name/text, so give the name to this entity on this layer
  • This Polyline is not proper.
    It means Highlighted polyline not drawn properly. So redraw that polyline & check the properties of that polyline.
  • Entity is not closed.
    It means the highlighted entities not a closed polyline so close it by using 'pedit' command.
  • Entity is supposed to inside one of the following entities.
    It means this highlighted entity should be present inside the one of the entities present in the given list“
  • Entity is supposed to touching one of the following entities.
    It means this highlighted entity is supposed to be touched one of the entities in given list
  • Entity should be outside overlapped with following entities.
    It means the highlighted entity should be outside overlapped with one of the th entities in the given list.
  • Entity must contain one of following entities.
    It means any one layer should be present inside in this entity which is listed.
  • Following sub entities are not found inside:
    • Direction Ref Point on layer _Floor,
    • Type: BLOCK, Color: ByLayer Status:
    • Common Point on layer _ResiFSI,
    • Type: BLOCK, Color: ByLayer Status:

    It means insert the direction reference circles in side of that entities.
  • Corresponding Building not found
    It means that proposed work not having building with same name. So assigned that building with having same name of proposed work.
  • Mark Substructures using PreDCR mark Substructure tool.
    It means mark the substructure by using mark -> Substructure menu. Do not type substructure name manually.
  • Corresponding Lift machine not found.
    It means Lift machine room having name not same in Plan & in section.
  • Section not found.
    It means If all the floor plans are drawn but one of them in section floor are missing to converting floor in section layer then this message are getting. So draw all the floor plans with floor in sections.
  • The corresponding entities not found in section.
    It means that listed entities not present in the section so show that entities in the section.
  • The corresponding entities not found in floor.
    It means that listed entities not present in the floor so show that entities in the floor plan.
  • Two Tanks should not have same Name.
    It means that two tanks not having a same name. So assigned two tanks by using Assigned name PreDCR menu.
  • Internal error or Fatal error while verify the drawing.

    Copy that file and paste it into the new drawing file & then verify.
    If Drawing is automatically closed / crashed while marking any entity or verify complete drawing.
    Copy that file and paste it into the new drawing file & then verify.
  • Some problem occurred in current process…Aborting code: 0

    While performing verification if following massage comes, then follow the steps.
    Check each layer separately until you found problematic layer. After that those layers redraw.
    While performing verification if following massage comes, then follow the steps. Check each layer separately until you found problematic layer. After that those layers redraw.

First, you need to visit URL:   https://maha.autodcr.com/bpamsclient/
For applying, you need to register yourself with required details such as education documents, COA/ License Certificate and AADHAAR No. for License Technical Person
(NOTE: - AADHAAR No. is mandatory for registration).
You need to pay registration fees if any.
After registration login with credentials and you can submit the building permission application with proper document and proposed plan.

The key activities of the department are:
  • To give permission to new building construction as per provisions of DC Rules.
  • To give permission to addition/alteration proposed in the existing authorized building.
  • To give approval for change of user as per provision of DC Rules.
  • To give approval for the utilization of TDR as per provision of UDCPR 2020.
  • To give development permission for the reserved / designated lands as per provision of UDCPR 2020.
  • To give permission for change of Zone.
  • To grant repair permission for structural repairs of the building.
  • The detailed list of documents to be accompanied with application is available in online application form. Some of the Mandatory documents are as follows:-
    • Ownership Title Document
    • Property Registered Card
    • NOC issued from different competent authority required if the case demands.

    With application, Transaction fees need to be paid online and all other fees shall be paid as per the demand note/challan generated at various stages of construction.

    Airports Authority of India, National Monuments Authority, Collector Office are some of the external NOC required as per the necessity of the plot location.

    Yes. The Architect can grant approval to Low Risk buildings as per UDCPR 2020 Regulations.

    There is a helpdesk system in AutoDCR application. Any user can log in an issues and get the resolution with in a time bounded manner.

    The common reasons observed for rejection of the application are as follows: -
    • All mandatory documents mention in application are not uploaded and saved.
    • The plans submitted are not as per DC Rules.
    • The mandatory NOCs are not uploaded along with online application.
    • The documents uploaded are not properly scanned and are not visible.
    • The valid ownership documents are not uploaded in order in favor of applicant.

    Yes. Until the application is not submitted, Architect can change the information in building application.

    Yes. There is Provision to apply for revised case.
    However, Authority should approve your existing building application.

    Yes. For all completed buildings applicant need to apply for Occupancy.

    If applicant is unable to provide proper document or correction in drawing, then the application for Building/ Layout will be rejected.

    LTP Users are categorized as below.
  • Architect
  • License Engineer
  • Structural Engineer
  • Supervisor 1
  • Supervisor 2
  • Town Planner
  • Geotechnical Engineer
  • Site Engineer
  • Yes. PAN Card and AADHAR number are required while registering on portal.

    • COA / Qualification Certificate
    • Applicant Photo
    • Identity Proof (Aadhaar Card with Photo)
    • Self-Declaration (Self-Declaration form available on site for download)

    No. LTP has to submit mandatory documents first and then only he can start using the portal

    No. LTP has to submit mandatory documents first and then only he can start using the portal

    No.

    Password can be changed but user name cannot.

    The fees as below for each ULB
    • For Engineer, Structural Engineer and Town Planner. Rs.3000/- For three years.
    • For Supervisor (1) and for Supervisor (2) Rs.1500/- For three years.

    These fees shall be increased by 10% for every three years.

    No, it is a MH state portal Registration where LTP needs to pay fees once.

    Yes, LTP shall be registered at MH state portal and can submit application for entire state where UDCPR 2020 is applicable.

    No.

    Firms types are listed below.
    • Individual Owner
    • Single Owner with Multiple Holders
    • Individual Owner Proprietary Firm
    • Partnership Firm
    • Private Limited Firm
    • Public Limited Firm
    • Government Semi Government Firms
    • Trust
    • Joint Venture (JV)
    • Limited Liability Partnership (LLP)
    • Association of Persons (AOP)
    • Special Purpose Vehicle (SPV)